Skip to content

chore(release): prepare 0.0.7#114

Merged
DavidBabinec merged 1 commit into
mainfrom
chore/release-0-0-7
Jun 29, 2026
Merged

chore(release): prepare 0.0.7#114
DavidBabinec merged 1 commit into
mainfrom
chore/release-0-0-7

Conversation

@DavidBabinec

Copy link
Copy Markdown
Contributor

Summary

  • Bumps the package version to 0.0.7.
  • Updates deployment docs that pin the published GHCR image tag to 0.0.7.
  • Adds the 0.0.7 changelog entry for the changes since v0.0.6.

Why

The release workflow is tag-driven, and the repo's release docs require pinned deployment surfaces to be updated before tagging a new version.

Verification

  • bun run build
  • bun test
  • bun run lint

Release follow-up

After this PR is merged, tag and push v0.0.7 from the merge commit to trigger the release workflow.

@DavidBabinec
DavidBabinec marked this pull request as ready for review June 29, 2026 16:00
@DavidBabinec
DavidBabinec merged commit 1a5625c into main Jun 29, 2026
6 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant